Building & joinery
Making use of the loft.
A look at loft boarding and hatch work, from the opening and supporting timber to the boarded floor and finished trim.
Explore the service
01 / Work notes
The opening and the frame.
The open hatch and timber support frame show the work before the edges are finished.
02 / Work notes
Boarding and the final trim.
The floor is boarded beneath the roof timbers. From the room below, new timber trim frames the hatch.
Your next chapter
Start a project